Explain what is SAP PP?


SAP PP process is related to production planning of a company and it encompasses all activities like MRP (Material Requirement Planning), BOM (Bills Of Material), Routing, Capacity planning, etc. but mainly it contains two segments

  • Material Planning: Material requirements planning, long term planning,
  • Execution Planning: Creation of production order, workflow, conformations, technical completion and good movement

Mention what are the production process in SAP?


There are three types of production process in SAP

  • Discrete Manufacturing
  • Repetitive Manufacturing
  • Production- Process Industries

List out the activities carried out in Production Planning?


Activities involved in Production Planning includes

  • Processing material master
  • Creation of Bill of Material
  • Displaying work center and routing
  • Maintaining planning calendar
  • Maintaining production lot
  • Maintaining quota file
  • Defining range of coverage profile and profile for safety time
  • Defining MRP views

What are the steps of Production Execution Process?


Production Execution steps include

  • Converting planned order to production order
  • Releasing the production order
  • Goods issue for production order
  • Confirmation of production order
  • Goods receipt against production order

What are the reports generated in product cost controlling information system?


Product Cost Controlling information system generates information for following areas

  • Product cost planning
  • Cost object controlling with the subcomponents
    • Product cost by period
    • Product cost by order
    • Product cost by sales order
    • Costs for intangible goods and services
  • Actual costing / Material Ledger

Explain what is “work center” in SAP PP and what is the use of Data in Work Centers?


Work Centers” are business objects in SAP-PP  that is used in task list operations ( routings, maintenance task lists, inspection plans) and work orders. Data in work center is used for

  • Scheduling: Formulas and operating time are entered, so that the duration of an operation can be calculated
  • Costing: Formulas are entered so that the costs of an operation can be calculated
  • Capacity Planning: The available capacity and formulas for capacity requirements is entered
  • Simplifying operation maintenance: Various default values can be included in the work center

What is the use of MRP PP evaluations?


This role contains a function for evaluating the MRP result. This function can be used to find information about the availability of material and to identify any material shortage situation.

Mention what is the purpose of using Capacity Planning?


Capacity Planning supports planning in all phases

  • Long term rough cut planning
  • Medium term planning
  • Short term planning

It can be integrated with various SAP applications like SAP-SD, PP, PP-SOP, PP-LTP, PP-SFC, etc.

Explain what happens to planned after it has been converted into production order?


When planned order is converted to the production order, the planned order are offset by production order. The planned order reference can be seen in the production order.

Mention what is the difference between stock transport order and stock transfer order?


  • Stock transfer order: It is referred to the transfer of stock for the usage in the same company
  • Stock transport order: It is referred to the change of title of stock in the name of the buyer